午夜免费男女aaaa片_特黄做受大片又粗又大又黄_精品亚洲卡一卡2卡三卡乱码_日韩欧美亚洲综合久久_欧美午夜成人片在线观看_AV在线亚洲欧洲日产一区二区_亚洲婷婷综合色高清在线_久久精品99久久香蕉国产_97四房播播_激烈 痉挛 抽搐 潮喷 mp4

Welcome to ZHEJIANG HUANCHOU MECHANICAL EQUIPMENT MANUFACTURING CO., LTD web site!
Sitemap?。?a href="/En/contact">Contact
Logo
Email:sales01@zj-huanchou.com
TEL/WHATSAPP/WECHAT:+86 15268661048
              +86 15257952553

TEL/WHATSAPP/WECHAT:
+86 15268661048

Hot keywords:Three dimensional transparent film packaging machine | vertical food packaging
Email:sales01@zj-huanchou.com
TEL/WHATSAPP/WECHAT:+8615268661048

Common problemAbout Us

Home >Common problem

Maintenance plan of automatic injector assembly machine
發(fā)布:admin 瀏覽:5618次

First, daily maintenance

1. check the power supply and electric control switch, knob is safe and reliable, to work in all parts of the inspection, there is no abnormal phenomenon and sound, complete equipment inspection card; 2. should maintain complete equipment, lines, gas path intact;

3. to ensure that all parts of the equipment running flexibly;

4. check the equipment inspection system regularly to ensure the normal operation of the equipment,

5. after the end of the daily use of equipment, after the power cleared in time, there is no debris on the rotating disk, so as not to start the machine when rotating into the device, the occurrence of stuck phenomenon.

Two. Monthly maintenance

1. check whether the power supply and electrical control switch, twist and so on are safe and reliable, and whether there is any abnormal phenomenon and sound in each part,

2. lines, gas road integrity, spare parts without defects,

3. inside and outside the equipment clean, no dust, no drop products,

4. drive gear coated with grease lubrication, sliding bearing plus lubricating oil.

Three. Annual maintenance


1. check whether the electrical connectors in electrical cabinet are loose or not,

2. power supply, the power supply voltage of the test equipment is in line with the provisions,

3. inside and outside the equipment clean, no dust, no drop products,

4. replace the retarder oil,

5. drive gears coated with grease lubrication,

6. pass test to check whether the operation of the operating mechanism is normal or not,

After 7. maintenance, the handle should be placed in the non working position, the electrical control switch, twist, etc. revert to "0" position, cut off the power supply.

8. fill in the equipment annual maintenance plan.